<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Cosmic Frontier Labs Blog</title>
    <link>https://www.cosmicfrontier.org/blog</link>
    <description>Updates from Cosmic Frontier Labs</description>
    <language>en-us</language>
    <atom:link href="https://www.cosmicfrontier.org/rss.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>Vibration Test Complete</title>
      <link>https://www.cosmicfrontier.org/blog/vibration-test-complete</link>
      <guid isPermaLink="true">https://www.cosmicfrontier.org/blog/vibration-test-complete</guid>
      <pubDate>Tue, 10 Mar 2026 00:00:00 GMT</pubDate>
      <description>The Dynamic Test Model has completed vibration testing! The assembly survived sine vibe, and random +3db above the full launch loads in all axes, validating the structural design, our workmanship, and...</description>
      <category>Engineering</category>
    </item>
    <item>
      <title>Dynamic Test Model Built</title>
      <link>https://www.cosmicfrontier.org/blog/dynamic-test-model-built</link>
      <guid isPermaLink="true">https://www.cosmicfrontier.org/blog/dynamic-test-model-built</guid>
      <pubDate>Fri, 06 Feb 2026 00:00:00 GMT</pubDate>
      <description>The Dynamic Test Model is fully built up! This build brings together every major structural element of the telescope: the optical bench, the metering struts, the mirror surrogates, and a working fast...</description>
      <category>Engineering</category>
    </item>
    <item>
      <title>MSM Optical Bench Complete</title>
      <link>https://www.cosmicfrontier.org/blog/msm-optical-bench-complete</link>
      <guid isPermaLink="true">https://www.cosmicfrontier.org/blog/msm-optical-bench-complete</guid>
      <pubDate>Mon, 26 Jan 2026 00:00:00 GMT</pubDate>
      <description>The optical bench for our Mass Simulator Model (MSM) is complete. This precision machined stainless steel structure forms the foundation of the telescope, and seeing it fully assembled marks a...</description>
      <category>Engineering</category>
    </item>
    <item>
      <title>Zerodur Mirror Blanks Complete</title>
      <link>https://www.cosmicfrontier.org/blog/zerodur-mirror-blanks-complete</link>
      <guid isPermaLink="true">https://www.cosmicfrontier.org/blog/zerodur-mirror-blanks-complete</guid>
      <pubDate>Mon, 22 Dec 2025 00:00:00 GMT</pubDate>
      <description>Our Zerodur mirror blanks have been completed and handed off to our optical fabrication partner for grinding and polishing. This marks a major milestone in our telescope program—we now have flight...</description>
      <category>Engineering</category>
    </item>
    <item>
      <title>Spacecraft Bus Provider Downselect Complete</title>
      <link>https://www.cosmicfrontier.org/blog/spacecraft-bus-provider-downselect-complete</link>
      <guid isPermaLink="true">https://www.cosmicfrontier.org/blog/spacecraft-bus-provider-downselect-complete</guid>
      <pubDate>Thu, 18 Dec 2025 00:00:00 GMT</pubDate>
      <description>We&apos;ve completed our spacecraft bus provider downselect, a critical decision that shapes nearly every aspect of our demonstration mission. After months of detailed evaluation across multiple...</description>
      <category>Engineering</category>
    </item>
    <item>
      <title>Fit Check Ongoing</title>
      <link>https://www.cosmicfrontier.org/blog/fit-check-ongoing</link>
      <guid isPermaLink="true">https://www.cosmicfrontier.org/blog/fit-check-ongoing</guid>
      <pubDate>Wed, 17 Dec 2025 00:00:00 GMT</pubDate>
      <description>We completed a fit check of the major mechanical assemblies for our dynamic test model, verifying that all components interface correctly before vibration and assembly testing. What is a Fit Check? A...</description>
      <category>Engineering</category>
    </item>
    <item>
      <title>First Parts Received for Mass Simulator</title>
      <link>https://www.cosmicfrontier.org/blog/first-parts-received-for-mass-simulator</link>
      <guid isPermaLink="true">https://www.cosmicfrontier.org/blog/first-parts-received-for-mass-simulator</guid>
      <pubDate>Sat, 29 Nov 2025 00:00:00 GMT</pubDate>
      <description>Following our Manufacturing Readiness Review earlier this month, we&apos;ve received the first batch of parts for the mass simulator build. Mock Mirrors A key component of the mass simulator is the mock...</description>
      <category>Engineering</category>
    </item>
    <item>
      <title>Launch Booked for Q4 2027</title>
      <link>https://www.cosmicfrontier.org/blog/launch-booked-for-q4-2027</link>
      <guid isPermaLink="true">https://www.cosmicfrontier.org/blog/launch-booked-for-q4-2027</guid>
      <pubDate>Thu, 13 Nov 2025 00:00:00 GMT</pubDate>
      <description>We&apos;ve booked a launch for Q4 2027. Having a confirmed slot on the manifest changes everything. A Real Date There&apos;s something different about working toward a real date versus a notional schedule....</description>
      <category>News</category>
    </item>
    <item>
      <title>Dynamic Test Model Manufacturing Readiness Review Complete</title>
      <link>https://www.cosmicfrontier.org/blog/dynamic-test-model-manufacturing-readiness-review-complete</link>
      <guid isPermaLink="true">https://www.cosmicfrontier.org/blog/dynamic-test-model-manufacturing-readiness-review-complete</guid>
      <pubDate>Mon, 11 Nov 2024 00:00:00 GMT</pubDate>
      <description>We&apos;ve completed the Manufacturing Readiness Review (MRR) for our dynamic test model, marking a key milestone in our telescope development program. What is a Dynamic Test Model (DTM)? A DTM/mass...</description>
      <category>Engineering</category>
    </item>
  </channel>
</rss>